image/svg+xml The SwitchMed programme is funded by the European Union image/svg+xml image/svg+xml

Production stops in a metal packaging manufacturing facility are due to interuptions in the supply of pallets from the store to the production site. Reviewing the procedures for transfer of material, having the raw material supply within the priority of forklift drivers, and assuring strategic stock of raw material within the production hall eliminates those interuptions, providing production gains.